Injury Gap Looms Before Michigan State's Critical Path to a Bowl
Spartans lost key defensive players in their rivalry win and face a fast Washington offense this weekend.
By Sakura Ellis ·

Michigan State enters its final three games with a fragile defense and a non-negotiable schedule.
The Spartans defeated Michigan 15-9 in Ann Arbor on Saturday, securing their first victory in the rivalry since 2021. The win was built on a defensive effort that limited the Wolverines to a single fourth-quarter touchdown. Despite multiple injuries, the unit held the opponent to just nine points over four quarters. Captain defensive end Kenny Soares Jr. made the final play of that defensive stand by stopping a two-point conversion attempt.
Head coach Pat Fitzgerald shifted his focus to Washington on Monday. He described the Huskies' offense as explosive and their defense as physical. Fitzgerald identified quarterback Demond Williams as the primary threat, calling him too complete to ignore. “He’s just too complete of a quarterback, but we’ve got to be able to find a way to contain him to be able to keep points off the board,” Fitzgerald said. He added that limiting Williams would be a huge challenge for the Spartan defense.
The team faces a thin roster after losing safety Devin Vaught and linebacker Dion Crawford during the Michigan game. Neither player returned to the field after their injuries. The coaching staff has not announced their status for the upcoming contest. The Spartans must adapt their defensive scheme without these two starters.
Michigan State currently holds three wins. The program needs victories in its next three games to reach the six-win threshold for bowl eligibility. Washington will visit East Lansing on Saturday at 4:15 p.m.





